Introduce:
Spinning die-head adopts design optimization of flow models of coat-hanger type, equality distribution of melt, balance pressure
Non-broken or combine fibre no holes no blind angle, and fastly
Color transition. Rolling mill adopts DC motor universal joint transfer,
Roller adopts technology of Ultra Laser Drilling to ensure the same of the temperature,
No Hair-in filling. The equipment adopts cutting on line, automatic low winding technology, in order to serve
Resource, and improve the production efficiency.
Major Characteristics:
1. The whole line is well-structured and easy to operate
2. The whole line highly automated
3. Control elements are of well-know make, high performance and reliable technologies
4. The whole line are controlled by PLC and operated with touch -scree.
5. The allocation of the main frame and auxiliary equipment can be special designed and configurated according to customer's requirements.
Production line characteristics:
Product width: 1600mm
Production capacity: 2200T/year(According to 60G/M2, 7800h per year) Main raw material PP
Product basis weight: 10~200G/M2
Production speed: 10~300m/min
Technological process of the production line:
Raw materialPellet feeding Melting and Extruding Filtration MeteringSpinningAir drawingWeb formingThermal calenderingstrainingRolling upCutting and packing
The TY OF DIE |
Effective width |
GSM |
Annual capacity |
Embossing pattern |
1 |
1600mm |
10-250GSM |
1500T |
Diamond, oval, cross , and line |
1 |
2400mm |
10-250GSM |
2400T |
Diamond, oval, cross , and line |
1 |
3200mm |
10-250GSM |
3000T |
Diamond, oval, cross , and line |
SS |
1600mm |
10-250GSM |
2400T |
Diamond, oval, cross , and line |
SS |
2400mm |
10-250GSM |
4000T |
Diamond, oval, cross , and line |
SS |
3200mm |
10-250GSM |
5000T |
Diamond, oval, cross , and lin |


FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)
2. Q:How many days will you finish installing ?
A:We will finish installation and training within 15 days.
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Q:How long is your machine's warranty period?
A: All our machine have half a years guarantee for electricity parts and one years guarantee for mechanism, starting from finished installation.
5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.
6. Q:How could you do after one year warranty period?
A:We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Q:Can you help us find any engineer in our location?
A:Of course, we will check and inform you as soon as possible.
9. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.