• High Speed PP/PE Granulator Raw Material Recycling Machine
  • High Speed PP/PE Granulator Raw Material Recycling Machine

High Speed PP/PE Granulator Raw Material Recycling Machine

After-sales Service: Support
Warranty: 1 Year
Material Processed: Film
Plastic Type: PP
Screw: Double-Screw
Automation: Automatic
Samples:
US$ 20000/Set 1 Set(Min.Order)
| Request Sample
Customization:
Gold Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
SJ-D
Computerized
Computerized
Certification
ISO9001:2008, CE
Model
Sj-D90/90
Speed of Screw
10-120r/Min
Total Heating Power
50kw
Capacity
100kg/H
Power of Cutter
2.2kw
Weight
3000kg
Dimension
6m*3.5m*1.5m
Raw Material
PE
Transport Package
to Be Packes in Wooden Case,Then in Container
Specification
3000KG
Trademark
zhuding
Origin
China
Production Capacity
10 Sets/Month

Product Description

High Speed PP/PE Granulator Raw Material Recycling Machine
It's assembly can be used to process clean or old broken PP/PE plastics into granules that can be reused
an the raw materials. The helical gear reducer made of 20CrMnTi alloy steel is applied to the extruder and
the screw and cylinder are made of 38CrMoA1A alloy steel after nitrogenization treatment, which is
durablelt consists of main extruder and sub-extruder, water tank and cutting part with alloy rotary cutter.
Besidesit is optional to be collocated with drying fan.
High Speed PP/PE Granulator Raw Material Recycling Machine

Model

SJ-D90/90

Diameter  of  screw  steam

Main  screw          90mm

Sub-screw            90mm

L/D  Ratio

Main  screw          20: 1

Sub-screw            12: 1

Power  of  motor

Main  screw          30kw

Sub-screw            11kw

Speed  of  screw

10-120r/min

Total  heating  power

50kw

Capacity

100kg/h

Power  of  cutter

2.2kw

Weight

3000kg

Dimension

6m*3.5m*1.5m
 High Speed PP/PE Granulator Raw Material Recycling MachineHigh Speed PP/PE Granulator Raw Material Recycling MachineFAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)

2. Q:How many days will you finish installing ?
A:We will finish installation and training within 15 days.

3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.

4. Q:How long is your machine's warranty period?
A: All our machine have half a years guarantee for electricity parts and one years guarantee for mechanism, starting from finished installation.

5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.

6. Q:How could you do after one year warranty period?
A:We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.

7. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.

8. Q:Can you help us find any engineer in our location?
A:Of course, we will check and inform you as soon as possible.

9. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory
Type of Ownership
Limited Company
Export Year
2008-12-08