*Plane cam and connecting rod rolling wheel transmission, which is the most advanced technology are adopted,making it easy and stable to run.
*Rolling transmission is adopted in entire structrue instead of slide block and slide rod, which doesn' t need lubricant and decreases the wearing part.
* It's an environmental product whose noise is not more than 82dB(A).
* Low strength plastic yarn which is made from 100% regenerated plastic can be adopted to weave.
* It is high-efficient and energy economical. The highest rotation speed of the main motor can reach 180r/min and
the power is 1.5/2.2kw, which can save
* It is the latest type circular loom
Four shuttle
Type |
Number of shuttle |
Folding width ofweaving |
Max. number of warp |
Rotational speed of main motor(r/min) |
Production (m/min) |
Power of main motor(KW) |
Total power(kw) |
Weight (About) (kg) |
Imachine size (L X W X H) |
ZD-PC-4/750 |
4 |
350-750 |
768 |
140-180 |
1.4-1.8 |
1.5/2.2 |
2/2.7 |
1900 |
8300 X 2200 X 2730 |
Six shuttle
Type |
Number of shuttle |
folding width of weaving |
Max. number of warp |
Rotational speed of main motor(r/min) |
Power of main motor |
Total power (kW) |
Weight (About) |
Machine Size (L X W X H) |
S-YZJ-850/6S |
6 |
350-850 |
720 |
120-180 |
2.2/3 |
2.7/3.5 |
3000 |
9100*2410*3100MM |
FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)
2. Q:How many days will you finish installing ?
A:We will finish installation and training within 15 days.
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Q:How long is your machine's warranty period?
A: All our machine have half a years guarantee for electricity parts and one years guarantee for mechanism, starting from finished installation.
5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.
6. Q:How could you do after one year warranty period?
A:We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Q:Can you help us find any engineer in our location?
A:Of course, we will check and inform you as soon as possible.
9. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.