Characteristics:
1. Adopt the anilox roller to spread ink.
2. Unwinding and rewinding are controlled by magnetism power brake, clutch. (or by automatic tension controller of mitsubishi, made in Japan).
3. Printing unit adopt 360 for registration.
4. Printing unit have one infrared to dry the device group each.
5. The rubber roller can break away from automatically while parking, and running at a low speed, in order to avoid water being black to be dry.
6. The main motor is adopted the import stepless regulation of frequency conversion.
7. Unwinding, printing, varnishing, IR drying, laminating and rewinding can be finished in one process, this kind of printing machine is best for each printing companies to print on adhesive-paper labels
Flexo printing machine Printing color |
4-8 |
Printing width |
1200mm |
Material width |
1250mm |
Printing length |
1200mm |
Landing version of the system |
pneumatic |
The maximum mechanical speed |
120m/min |
The maximum printing speed |
80-150m/min |
Anilox (ceramic is optional) |
Special for Non woven fabric |
Registration accuracy |
L=0.05-0.15 T=0.15-0.2 |
Unwinding roll diameter |
600mm |
Rewinding diameter |
800mm |
Winding and rewinding paper core |
3" -6" |
Drying methods |
Electric control |
Drying Power |
16-24kw |
Big blower |
1.5kw*2 |
Small blower |
1.1kw*2 |
Main Motor |
3.7kw |
Gross power |
30kw |
Main Frequency |
3.7kw |
Mechanical dimension |
2.5*2.6*2.4m |
FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)
2. Q:How many days will you finish installing ?
A:We will finish installation and training within 15 days.
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Q:How long is your machine's warranty period?
A: All our machine have half a years guarantee for electricity parts and one years
guarantee for mechanism, starting from finished installation.
5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.
6. Q:How could you do after one year warranty period?
A:We also can do service for you, but you need pay
salary for our technicians 80USD/day for each person.
7. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Q:Can you help us find any engineer in our location?
A:Of course, we will check and inform you as soon as possible.
9. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.