• Bag Making Equipment
  • Bag Making Equipment
  • Bag Making Equipment
  • Bag Making Equipment
  • Bag Making Equipment
  • Bag Making Equipment

Bag Making Equipment

After-sales Service: Video Technical Support, Online Support, Spare PAR
Warranty: 1 Year for Machinery Warranty
Lines: 1
Voltage: 220V
Seals Mode: Trilateral Seals
Speed: High
Customization:
Gold Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
SCD800
Continuous-Rolled
Yes
Sealing & Cutting
Heat-Sealing Cold-Cutting
Layer
Double
Machine Type
Bag Cutting and Sewing Machine
Computerized
Computerized
Type
PP Woven Bag Cutting and Sewing Machine
Transport Package
Woob Box
Specification
6000*6500*1800mm
Trademark
ZhuDing
Origin
Zhejiang China
Production Capacity
20-30PCS

Product Description

Product Description
 

Performance and Characteristic:

This machine is for non-woven fabric bag making, with automatic bottom sewing and side sewingtwo Japanese newlong sewing head, PLC control, Touch-screen operation, servo motor for makingexactly size, with auto tension and edge guider device. Pneumatic take-up raw material roller, Itour factory latest machine product. Very popular in market for making non-woven fabric heavyduty bag(80-150gsm non-woven fabric), If we set two program in PLC and use special cut blade, this machine can make pp woven sack at same time.


Bag Making Equipment
Max Dia Of Cloth Roller
1000mm
Total Power
8kw
Fabric Max. Width
1600mm
Production Capacity
20-30Pcs/Min
Folding Width
800mm
Cutting Precision
±1.5mm
Cutting Length
1200mm
Machine Size
6000*6500*1800mm
Max Cutting Width
800mm
Weight
2500kg


Company Information
Bag Making Equipment
Bag Making EquipmentShipping & Packaging
Bag Making Equipment
FAQ

 

1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor
etc.Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Contact Us

Bag Making Equipment

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory
Type of Ownership
Limited Company
Export Year
2008-12-08