Automatic Both Printing Registration System PP Woven Bag Laminating Machine

Product Details
Customization: Available
After-sales Service: Support
Warranty: 1 Year
Gold Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Type of Ownership
Limited Company
Export Year
2008-12-08
  • Automatic Both Printing Registration System PP Woven Bag Laminating Machine
  • Automatic Both Printing Registration System PP Woven Bag Laminating Machine
  • Automatic Both Printing Registration System PP Woven Bag Laminating Machine
  • Automatic Both Printing Registration System PP Woven Bag Laminating Machine
  • Automatic Both Printing Registration System PP Woven Bag Laminating Machine
  • Automatic Both Printing Registration System PP Woven Bag Laminating Machine
Find Similar Products

Basic Info.

Model NO.
ZD-FMF 105 / 1000B
Classification
Pre-Coating Laminating Machine
Application
Film Material, Fabric
Driven Type
Electric
Automatic Grade
Automatic
Plastic Film Mulching Modes
Hot Laminating
Performance
Waterproof
Heating Power of Extruder ( Kw )
32
Feature
Fully Automatic
Usage
Lamination
Weight
5500kg
Dimension(L*W*H)
13800*6000*2500mm
Voltage
220/380/440
Warranty of Core Components
1 Year
Coating Speed(M/Min)
30-120
Marketing Type
Hot Product 2019
Max Coating Width(mm)
800
Video Outgoing-Inspection
Provided
Machinery Test Report
Provided
Local Service Location
None
Power of Driving Motor (Kw)
5.5
Showroom Location
None
Transport Package
Wooden Packing
Specification
2200KG
Trademark
ZD
Origin
Zhejiang, China
Production Capacity
5 Set/Month

Product Description

Automatic Both Printing Registration System PP Woven Bag Laminating Machine
Performance and Characteristic:
(1)This Non woven fabric laminating machine making use of the good adhesive property of polypropylene & polyethylene at meltingstatusachine adheres and aminat espaper or color-printed OPP &CPP fiim to Nonwoven fabric, The extruder with helical gearreducer steel adoptsautomat ic temperature-control system to ad justmelting temperature, the screw and cylinderare made of 38CRMOAIA alloy steel and donetreatment of nitrogenation.
(2)The double-die cando single or double-face coating, width of coating&laminating can be regulated, automatically automatic edge cutting, edge-blowing, cutting-off and winding devices are applied.
(3)This machine has the functions of fully automatic material receiving and refuelling, PLC control system, fully automatic weight control system, man-machine operation interface, and it is a high-quality supply in the same industry.
 
 
Type/Item
Diameter of extruder screw
L/D ratio of screw
Number of Die
Width of Die
Total power(kw)
Power of extruder motor(kw)
Weight
ZD-FMF 105 / 1000B
105
28:01:00
2
1000
58
18.5
5500kg
ZD-FMF 105 / 1200B
105
28:01:00
2
1200
70
18.5
6000kg
Automatic Both Printing Registration System PP Woven Bag Laminating MachineAutomatic Both Printing Registration System PP Woven Bag Laminating MachineAutomatic Both Printing Registration System PP Woven Bag Laminating MachineAutomatic Both Printing Registration System PP Woven Bag Laminating MachineAutomatic Both Printing Registration System PP Woven Bag Laminating MachineAutomatic Both Printing Registration System PP Woven Bag Laminating Machine
Automatic Both Printing Registration System PP Woven Bag Laminating MachineAutomatic Both Printing Registration System PP Woven Bag Laminating Machine
FAQ
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor
etc.Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier