• Non Woven Fabric Lamination Machine Price
  • Non Woven Fabric Lamination Machine Price
  • Non Woven Fabric Lamination Machine Price
  • Non Woven Fabric Lamination Machine Price
  • Non Woven Fabric Lamination Machine Price
  • Non Woven Fabric Lamination Machine Price

Non Woven Fabric Lamination Machine Price

After-sales Service: Support
Warranty: 1 Year
Classification: Pre-Coating Laminating Machine
Application: Film Material, Fabric
Driven Type: Electric
Automatic Grade: Automatic
Samples:
US$ 40000/Set 1 Set(Min.Order)
| Request Sample
Customization:
Gold Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
ZD-FMF105/1000
Membrane Material
PP/HDPE
Plastic Film Mulching Modes
Hot Laminating
Performance
Waterproof
After Warranty Service 1
Video Technical Support
After Warranty Service 2
Spare Parts
After Warranty Service 3
Online Support
After Warranty Service 4
Field Maintenance and Repair Service
Transport Package
Wooden
Specification
1000 width of die
Trademark
zhuding
Origin
Zhejiang
Production Capacity
10set/Month

Product Description

Non Woven Fabric Lamination Machine Price
Performance and Characteristics

This nonwoven fabric laminating machine making use of the good adhesive property of polypropylene &polyethylene at melting status, the machine adheres and laminated paper or color-printed OPP &CPP film to nonwoven fabric, non woven bag under pressure, and through cut-off and the extruder with helical gear reducer of 20CrMoAIA alloy steel and done treatment of nitrogenation.

The double-die can do single or double-face coating, width of coating& laminating can be regulated, and stepless speed regalation in to control coating thickness and laminating speed, 6 wind-up station for material feeding. The gas-liquid edge correcting for rewinder assures the accuracy of coating. Pneumatic roller can assure even pressure. Automatic edgecutting, edge-blowing, cutting-off and winding devices are applied.

Main Technical Parameters

type/item diameter of extruder screw L/D ratio of screw number of die width of die gross power(kw) power of extruder motor(kw) heating power of extruder(kw) power of driving motor(kw)
SJ-FMF90/1000B 90 26:1 2 1000 58 15 32 5.5
SJ-FMF110/1200B 90 26:1 1 1450 60 18.5 33 5.5
SJ-FMF110/1900B 110 26:1 1 1900 65 18.5 35 5.5

 

 

Non Woven Fabric Lamination Machine PriceNon Woven Fabric Lamination Machine PriceNon Woven Fabric Lamination Machine Price
Non Woven Fabric Lamination Machine PriceNon Woven Fabric Lamination Machine PriceNon Woven Fabric Lamination Machine PriceNon Woven Fabric Lamination Machine Price
FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)

2. Q:How many days will you finish installing ?
A:We will finish installation and training within 15 days.

3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.

4. Q:How long is your machine's warranty period?
A: All our machine have half a years guarantee for electricity parts and one years guarantee for mechanism, starting from finished installation.

5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.

6. Q:How could you do after one year warranty period?
A:We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.

7. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.

8. Q:Can you help us find any engineer in our location?
A:Of course, we will check and inform you as soon as possible.

9. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory
Type of Ownership
Limited Company
Export Year
2008-12-08